80W soldering iron heating element for JCD 8898 soldering station with long leads

Brand: Китай
Product Code: TKDB46B34-80W long
166 ₴

  • Availability: In Stock


A reliable and efficient 80 W heating element is designed for JCD 8898 soldering stations and other models in the JCD series. It provides fast heating and stable temperature during operation, making it an ideal choice for repairing, soldering electronics or working with printed circuit boards.


Main features:

✔ Material: Ceramic, which ensures durability and even heat distribution.
✔ Power: 80 W for efficient work even with difficult tasks.
✔ Voltage: 220 V, compatible with standard power supply.
✔ Size: 60 x 3.8 mm, which allows easy integration of the element into the soldering iron.
✔ Compatibility: Suitable for JCD 908, 908S, 8898, 908U soldering stations and other models with similar characteristics.
✔ Long leads: Makes connection and installation easier.


Advantages of the 80W heating element:

✔ Fast heating: Reduces waiting time before starting work.
✔ Stable temperature: Ensures accuracy and quality of soldering.
✔ Durability: Thanks to high-quality ceramics and reliable performance, the element will last a long time even with intensive use.
✔ Wide compatibility: Easily installed in popular models of JCD soldering stations.
✔ Convenient installation: Thanks to its compact size and well-thought-out design.


Scopes application:

➢ Electronics Repair: Ideal for soldering boards, components and small parts.
Soldering iron modernization: Used as a replacement for an old heating element to extend the service life of the equipment.
➢ Workshops: Suitable for professional use in service centers.
➢ Home repair: Indispensable for electronics enthusiasts and home soldering.


Why choose the JCD 80W heating element from WST?

✔ Reliability: High quality materials and assembly.
✔ Compatible with popular soldering station models.
✔ Fast heating and stable operation.
✔ Affordable price and warranty from WST.


Replace your old heating element with a new one and ensure stable and high-quality operation of your soldering station. Order JCD 80W heating element today!

Write a review

Note: HTML is not translated!
    Bad           Good
Related Products